Our project teams are experienced in managing complex technical schemes within occupied and new‑build environments.

We bring meticulous planning, transparent reporting, and uncompromising quality to every project.

Each scheme is delivered under strict safety management, RAMS documentation, and third‑party oversight, ensuring performance, compliance, and confidence.

Battersea Reach – London

  • Sector: Retail
  • Scope: Removal and replacement of canopy glass panels, ensuring a safe and controlled process from start to finish.
  • Duration: 2 days
  • Team: 4 operatives



Green Park – Reading

  • Sector: Commercial offices
  • Scope: Full curtain wall remediation, including structural calculations, replacement glazing, design and installation of new door sets, CWCT water testing and cavity fire barrier installation.
  • Duration: 16 weeks


NW9 – North West London

  • Sector: Residential apartments
  • Scope:
    • CWCT water testing
    • Removal of existing zinc cladding
    • Installation of EPDM membranes
    • Reinstatement of existing zinc cladding
    • Application of silicone


Sovereign Court – Hammersmith

  • Sector: Mixed Use
  • Scope:
    • Traffic marshalling
    • Working at height using a MEWP
    • Targeted opening up works of the façade
    • Intrusive FRAEW inspections
    • Careful reinstatement of the façade

Battersea Reach – London

  • Sector – Retail
  • Scope – Removal and replacement of canopy glass panels, ensuring a safe and controlled process from start to finish.
  • Duration – 2 days
  • Team – 4 operatives

Green Park – Reading

  • Sector – Commercial offices
  • Scope – Full curtain wall remediation, including structural calculations, replacement glazing, design and installation of new door sets, CWCT water testing and cavity fire barrier installation.
  • Duration – 16 weeks

NW9 – North West London

  • Sector: Residential apartments
  • Scope:
    • CWCT water testing
    • Removal of existing zinc cladding
    • Installation of EPDM membranes
    • Reinstatement of existing zinc cladding
    • Application of silicone

Sovereign Court – Hammersmith

  • Sector: Mixed Use
  • Scope:
    • Traffic marshalling
    • Working at height using a MEWP
    • Targeted opening up works of the façade
    • Intrusive FRAEW inspections
    • Careful reinstatement of the façade